|
|
Firewall
The batteries sit on a 1" angle with 5 avex upset rivets thru the firewall...
The batteries (2 for Dual Leburg EI) are snug between the angle base and the top station 1 tube...
We are using 5 clamps to attach the firewall...
![]() The battery straps are milled from a Nylon like material that was also used for the control stick bearing blocks... The straps are secured with AN3 bolts and blind fasteners on the front of the firewall...
![]() The fire wall, instrument panel are nearing completion here... The 2 Honda CBR 600 coils at the bottom of the firewall are for the Leburg EI...
![]() |